On this page
Customs release is not the end of the packing plan
An overseas supplier may mark each imported spare correctly, then the U.S. distributor places it inside branded retail packaging. The operational question is what happens to the mark during that later step. This page assumes the actual origin and original marking have been separately assessed.
For articles within § 134.26, the importer certifies that its repacking will preserve the mark or appropriately mark the new container. If transferring to a subsequent purchaser/repacker, it must give the specified written notice at the sale or transfer.
A sealed sleeve changes what the purchaser can inspect
Fictional example: marked parts arrive in bulk, and a U.S. packaging firm puts each into an opaque branded sleeve. Management needs an approved packaging and handoff answer before releasing the retail stock.
| Stage | Record to check |
|---|---|
| Imported part | Actual origin assessment and visible/permanent mark |
| New sleeve | What it hides and what origin wording the final pack needs |
| Importer certification | Applicable certification and filing evidence |
| Transfer to the repacker | Written notice supplied at the actual sale/transfer |
| Retail release | Approved artwork and a sample of the finished pack |
A pack that opens easily has a specific exception
Section 134.26(f) excepts repackaging in a container readily opened for ultimate-purchaser inspection, unless it bears a U.S. address or other potentially misleading marking. Do not assume that every transparent, resealable or branded package meets that exception.
The certification is due at entry summary under the stated rule; missing-document/bond provisions are conditional. Plan the retail packing facts before that filing, rather than discovering the change when the repacker sends a finished sample.
Assign the design change and release checks
Give the importer, packaging supplier and customs reviewer the same artwork and physical sample. If the U.S. address, container or article changes, send the changed facts back into the assessment.
Use Launch dependencies’ supply task for the responsible role, evidence reference and unresolved packing decision. Keep the actual certification, written notice and artwork in the company’s controlled records.
Scope
- No actual origin, marking exception, container approval, certification sufficiency or complete label/product-compliance result is supplied. The opaque-sleeve example is fictional.
Next step
Assign the repacking/marking check under Launch dependencies’ supply task. Keep the certification, transfer notice and approved final pack together outside ELN.
Sources & review notes
U.S. Customs and Border Protection
Passage, dates and research notes
regulation · Complete §134.26(a)–(f): certification, transfer notice, filing and exception conditions
Full section read including certification alternatives, entry-summary timing, notice text and readily-opened exception with U.S.-address qualification. No certification template or accepted container supplied.
Detailed rule records (1)
Section 134.26 requires the applicable importer certification and, on sale/transfer to a subsequent purchaser/repacker, the written notice. The mark must not be obscured without the required container marking.
19 CFR134.26: post-release repacking and markingBookmark this guide or mark it as read.
Progress privacy
Saving is off by default. Without it, progress lasts only on this page. If you turn it on, this browser profile stores public content IDs and the progress you record. Anyone sharing the profile could see them. No plan inputs or contact details are included. Reset or export in learning settings.
This is a reading aid, not evidence of disclosure delivery, expertise or legal approval.