On this page

The same fee calendar does not apply to every patent type

The U.S. Patent and Trademark Office (USPTO) explains that maintenance fees are required for utility and reissue utility patents based on applications filed on or after 12 December 1980, unlike design/plant patents. Its ordinary no-surcharge windows are 3–3.5, 7–7.5 and 11–11.5 years after issue, followed by the stated surcharge windows.

Use the actual patent/application identifiers to obtain the current Maintenance Fees Storefront record, including payment windows and history. Check the actual payment and status; do not infer an expiry date or restored right from a generic twenty-year description.

Sources: U.S. Patent and Trademark Office: Main fee applicability/windows, patent/application-number lookup, statements, lapse and term cautions

Three portfolio entries create different evidence jobs

Fictional example: a licence schedule lists a U.S. utility patent issued in 2019, a U.S. design patent and a European patent. A receipt labelled annual licence fee covers the commercial payment. It does not supply the U.S. utility maintenance record or turn the foreign entry into a U.S. patent.

Portfolio entry/checkEvidence management needs
U.S. utility/reissue utilityActual type, filing/issue dates and current fee-history/window record.
Design or foreign entryIts own applicable record, territory and requirements.
Rights holderRecorded assignment information and the actual supporting chain.
Licence grantThe relevant party, rights, territory, limits and operative version.
Continuing taskWho monitors, pays where required and preserves acceptance evidence.

A database entry is one part of the file

USPTO’s assignment guidance separates transfer of ownership from a change of name and identifies the recorded-assignment search. Reconcile those records with the actual instruments rather than treating a familiar group name as the complete rights chain.

Ask the licence adviser what the grant actually covers and which status issues matter. Maintenance, ownership, validity, remaining term and permission are different questions. This guide does not decide that any particular patent is enforceable.

Sources: U.S. Patent and Trademark Office: Complete main body: assignment versus name change, supporting documents and recorded-assignment search

Assign monitoring even when someone else pays

Give each relevant entry a responsible person, next evidence date and backup contact. If the licensor performs the payment job, obtain the agreed evidence rather than merely assuming it occurred.

USPTO states that not receiving a maintenance reminder does not shift the monitoring responsibility. If a payment or status problem appears, obtain the actual options assessment promptly; do not describe a potentially available restoration process as already completed.

Sources: U.S. Patent and Trademark Office: Main fee applicability/windows, patent/application-number lookup, statements, lapse and term cautions

Scope

  • Selected USPTO guidance only; no actual fee deadline/status, title, discount eligibility, patent term, restoration, validity, infringement or licence permission is determined.

Next step

Use Partner evidence to record the actual patent/licence claim, dated official and agreement evidence checked, and the unresolved limits.

Sources & review notes

Access dates show when a source was retrieved. Review dates show when its meaning was checked. Editing this guide does not recheck the law.

Maintain your patent

U.S. Patent and Trademark Office

Passage, dates and research notes

official-guidance · Main fee applicability/windows, patent/application-number lookup, statements, lapse and term cautions

Accessed: 2026-11-16T10:34:56.402650+00:00 · Meaning reviewed: 2026-11-16T11:00:30.210408+00:00 · Next review target: 2026-12-16

Actual selected sections read. Utility/reissue utility filing-date scope differs from design/plant patents. No fee amount, automatic discount, restored right or exact expiration calculation adopted.

Patents Assignments: Change & search ownership

U.S. Patent and Trademark Office

Passage, dates and research notes

official-guidance · Complete main body: assignment versus name change, supporting documents and recorded-assignment search

Accessed: 2026-11-16T10:56:25.783677+00:00 · Meaning reviewed: 2026-11-16T11:00:30.210410+00:00 · Next review target: 2026-12-16

Full main body read. Database/recordation evidence is not treated as a complete ownership, validity or licence-scope opinion.

Detailed rule records (1)
The applicable patent type and actual fee history determine the maintenance check Depends on the facts

Ordinary no-surcharge windows run 3–3.5, 7–7.5 and 11–11.5 years after issue; surcharge windows extend to 4, 8 and 12 years under the stated conditions. Payment needs the patent and corresponding application identifiers and amount actually due.

When to check: Before relying on the patent package, and before each applicable payment window. Source review: 2026-11-16.

Maintain your patent Patents Assignments: Change & search ownership
Your learning

Bookmark this guide or mark it as read.

Learning library
Progress privacy

Saving is off by default. Without it, progress lasts only on this page. If you turn it on, this browser profile stores public content IDs and the progress you record. Anyone sharing the profile could see them. No plan inputs or contact details are included. Reset or export in learning settings.

This is a reading aid, not evidence of disclosure delivery, expertise or legal approval.